Iconic Projects Require an Iconic EHS&S Team

Contact Citadel Environmental Services for your next Iconic Project 

For close to 21 years, clients have relied on Citadel to meet their environmental, health, safety, and sustainability consulting needs for some very notable projects. 

 
Citadel is different from most EH&S firms in our space in that our focus is to address the human environment, the built environment.  Our engineers, hygienists, geologists, and technicians understand how buildings are built, operated, and deconstructed.  Further, Citadel delivers EHS&S services throughout the lifecycle of projects from site acquisition, through design, construction, operation, and eventual disposition in an integrated, cohesive fashion according to a shared set of Citadel Values and Advantages regardless of office, department, or employee-owner.  Below, we’re pleased to share some vignettes of some recently awarded or completed projects.   

Historic Los Angeles Union Station Restoration Project

Citadel has been providing environmentally-regulated materials (ERMs) surveys and project surveillance and monitoring services throughout the Los Angeles Union Station for their on-going 75th Anniversary Restoration Project. In the coming months, Citadel will be providing project surveillance and air monitoring during their major roof replacement project.


Metropolis Development Project 

Citadel provided a Phase I ESA for the five-building, LA Live-adjacent, mixed-use Metropolis megaproject, which includes "two hotel sites, two parcels dual-entitled for hotel/residential towers, all with ground floor amenity retail space. Shanghai-based developer Greenland and Gensler architects broke ground on the first phase of the $1 billion project.
 

Beverly Hills 'Robinson's May' & 'Hilton' Demolition Projects

The long-closed Robinson's May store and the Beverly Hilton near the intersection of Wilshire and Santa Monica boulevards are being razed to make way for a big new development called 9900 Wilshire. Citadel is currently contracted on behalf of the City of Beverly Hills to oversee all CEQA mitigation measures (air, noise, vibration, traffic, historical, cultural, etc.) required by the project applicants to act as liaison with the City and School Districts.

Martin Luther King Jr., Medical Center Renovation Project

Citadel provided ERMs Consulting services for the Los Angeles County Department of Public Works’ Inpatient Tower Renovation and Multi-Service Ambulatory Care Center Projects at the Martin Luther King, Jr. Medical Center, in Los Angeles. After nearly two years of construction, the $172 million-county-run center will begin serving the public on June 17, 2014.  

Historic Hollywood Park Race Track Demolition Project

Citadel was contracted as part of a proposed high-profile $2 billion community re-development project involving the demolition and re-development of the historic 238-acre Hollywood Race Track, Casino, and Pavilion complex. Citadel conducted a comprehensive demolition level, and Environmentally Regulated Materials Survey of the entire complex.



Historic Rose Bowl Stadium Renovation Project

Citadel was contracted by the Rose Bowl Operating Company, to act as Environmental Health & Safety Owner’s Representative for asbestos and lead issues during the $152 million renovation and re-development of the historic Rose Bowl. 


LAX 'Tom Bradley' International Terminal Monitoring Services

Citadel was contacted to provide compliance air monitoring services during construction at the recently remodeled Tom Bradley international terminal at the Los Angeles Airport (LAX). 

AEG Farmer's Field Proposed Construction

Citadel was contracted by AEG Worldwide to prepare CEQA/NEPA documentation related to hazardous materials during the preparation of the EIR for the proposed construction of Farmer’s Field. 

 

Historic Griffith Park Observatory Renovation Project 

In conjunction with the $93 million dollar renovation and expansion of the historically significant Griffith Observatory in Los Angeles, Citadel performed comprehensive hazardous materials surveys, prepared project specifications, pre-construction services and provided project surveillance, air monitoring, and contract administration assistance.